Tonghua JH Oxygen Lance Tip

Converter Oxygen Lance, Cone Oxygen Lance

Converter Oxygen Lance, Cone Oxygen Lance

Key benefit: Converter oxygen lance and cone oxygen lance — including dual-channel, split-flow and split types, with separate oxygen control and a self-shedding slag cone.

Features:

  • Proven structure, easy to maintain and repair.
  • Safe sealing, with no cross-leakage between oxygen and water.
  • Low cooling-water pressure drop, ensuring full cooling intensity.
  • Less slag sticking, reducing labor intensity and improving operating efficiency.
  • A quick-change device at the end of the lance makes lance changing fast and convenient.

Description

Application:

  • Converter oxygen lance and cone oxygen lance for converter steelmaking, covering dual-channel, split-flow, split and cone oxygen lance types.
  • The split-flow oxygen lance is suitable for the renovation of old factories.

Performance:

  • The main and auxiliary flow channels of the dual-channel oxygen lance are separated, and the oxygen pressure and oxygen flow rate are controlled separately. It supports secondary combustion of furnace gas and a higher scrap ratio.
  • The split-flow oxygen lance has similar functions to the dual-channel oxygen lance and does not require an independent auxiliary oxygen channel. It needs little investment, pays back quickly, and is suitable for the renovation of old factories.
  • The slag attached to the cone oxygen lance can fall off on its own, which alleviates the problem of slag sticking to the oxygen lance, reduces the labor intensity of workers, and improves production efficiency.
  • The split oxygen lance has a semi-permanent lance tail. When changing the lance, only the damaged front working section needs to be replaced. The use of the docking flange makes the lance replacement more convenient and rapid.

Specifications:

  • Furnace type: Converter steelmaking
  • Types: Dual-channel, split-flow, split and cone oxygen lances
  • Control: Oxygen pressure and oxygen flow rate controlled separately (dual-channel)
  • Other dimensions and parameters: Customizable

Packing and lead time:

  • Lead time: 2–4 weeks
  • Packing: Customizable

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.