Tonghua JH Oxygen Lance Tip

Tundish Impact Pad & Dam/Weir Set

Tundish Impact Pad & Dam/Weir Set

Key benefit: A precast refractory impact pad and dam/weir set supplied for the tundish in continuous casting, absorbing the ladle stream and guiding steel flow.

Features:
• Impact pad takes the impact of the ladle stream
• Dam and weir guide steel flow and extend residence time
• Helps inclusions float to the surface
• Made to the tundish drawing
• For use with submerged entry nozzle, slide gate plate, stopper rod and metering nozzle

Description

Overview

The Tundish Impact Pad & Dam/Weir Set is a set of precast refractory pieces for the tundish in continuous casting, supplied by JH. The impact pad sits in the tundish where the ladle stream enters, and the dam and weir stand in the steel flow path, so the set works together as one flow-control arrangement.

When the ladle stream hits the impact pad, the pad absorbs the impact and spreads the stream instead of letting it scour the tundish bottom. The dam and weir then guide the steel, slow it down and lengthen its residence time in the tundish, which helps inclusions float to the surface before the steel leaves the tundish.

Applications

  • Continuous casting tundishes
  • Tundishes receiving steel from the ladle
  • Flow control and inclusion flotation in the tundish
  • Use together with Submerged Entry Nozzle, Slide Gate Plate, Continuous Casting Stopper Rod and Tundish Metering Nozzle

Performance

The set is made as precast refractory pieces, so each piece arrives ready to install in the tundish. The impact pad is designed to take the direct impact of the ladle stream, while the dam and weir are designed to control the flow path and extend residence time. Each set is made to the drawing of the tundish it serves, so the pad, dam and weir fit the tundish shape and the positions of the ladle stream and the outlets.

Specifications

  • Type: Precast refractory impact pad and dam/weir set
  • Service: Continuous casting tundish
  • Impact pad: Takes the impact of the ladle stream
  • Dam and weir: Control steel flow, promote inclusion flotation, extend residence time
  • Form: Precast refractory pieces
  • Dimensions: Customizable — made to the tundish drawing
  • Supply: Supplied by JH

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.