Description
Overview
The tuyere middle sleeve — also called the second sleeve — sits between the large sleeve and the small sleeve in the blast furnace tuyere assembly. Its large end is carried by the large sleeve and its small end carries the small sleeve, so it transfers the load of the inner tuyere to the furnace shell while keeping the hot blast channel aligned. It runs water-cooled for its whole service life, in high temperature, high pressure and constant scouring by slag and hot metal, and it is the component most prone to warping and sagging in service.
Manufactured by Tonghua JH from copper and copper alloy, the middle sleeve is cast as a hollow blank, then formed by forging or spinning into a hollow truncated cone — small at the front, large at the rear — machined to size, and drilled with cooling water channels in the wall. The cone faces are machined so the sleeve seats gas-tight against the large sleeve and the small sleeve. Supplied as part of a complete tuyere set with the large and small sleeves, so all three sleeves match on the cone fits.
Applications
- Blast furnace tuyere assembly (large / middle / small sleeve set)
- Blast furnaces of 300–4,500 m³
- Tuyere replacement during relining or shutdowns; supplied with the large and small sleeves as a matched set
Specifications
- Material: copper / copper alloy casting (bronze); formed by forging or spinning, machined, with drilled cooling water channels
- Form: hollow truncated cone, small at the front, large at the rear
- Function: supports the small sleeve, transfers the tuyere load to the large sleeve and furnace shell
- Connection: large end cone-fitted inside the large sleeve; small end cone-fitted over the small sleeve
- Hot blast temperature: 1,100–1,300 °C (tuyere service condition)
- Testing: hydrostatic test at 1.5 times working pressure; seal test at 1.25 times working pressure (tuyere system standard)
- Dimensions: made to drawing, to match the large sleeve and small sleeve






