Tonghua JH Oxygen Lance Tip

Copper Tuyere Large Sleeve

Copper Tuyere Large Sleeve

Key benefit: The outermost sleeve of the blast furnace tuyere assembly, bolted to the flange seat on the furnace shell and carrying the middle sleeve and the small sleeve.

Features:

  • Copper construction; cast iron version available to drawing.
  • Supplied as part of a complete tuyere set — large sleeve, middle sleeve and small sleeve matched on the cone fits.
  • For 300–4,500 m³ blast furnaces; made to drawing to match the furnace tuyere opening and the middle sleeve.

Description

Overview

The tuyere large sleeve is the outermost sleeve of the blast furnace tuyere assembly. It is bolted to the flange seat welded on the furnace shell, and it carries the middle sleeve and the small sleeve, holding the whole tuyere assembly in line with the furnace body. Because it does not touch the burden, slag or hot metal directly, it works in a milder thermal environment than the inner sleeves, but it still has to stay gas-tight: any deformation of its sealing cone lets furnace gas escape.

Manufactured by Tonghua JH, the large sleeve is supplied as part of a complete tuyere set — large sleeve, middle sleeve and small sleeve — so the three sleeves match each other on the cone fits and can be assembled off-line and installed as one unit. The large end bolts to the furnace flange seat; the small end fits over the large end of the middle sleeve on a precision cone surface.

Applications

  • Blast furnace tuyere assembly (large / middle / small sleeve set)
  • Blast furnaces of 300–4,500 m³
  • New furnace builds and tuyere replacement during relining or shutdowns
  • Supplied together with the middle sleeve and small sleeve as a matched set

Specifications

  • Material: copper; cast iron version available to drawing
  • Function: supports the middle sleeve and small sleeve; connects the tuyere assembly to the furnace shell
  • Connection: large end bolted to the flange seat on the furnace shell; small end cone-fitted over the middle sleeve
  • Assembly: large sleeve, middle sleeve and small sleeve in stepwise decreasing diameters, assembled off-line
  • Furnace range: 300–4,500 m³ blast furnaces
  • Testing: hydrostatic test at 1.5 times working pressure; seal test at 1.25 times working pressure (tuyere system standard)
  • Dimensions: made to drawing, to match the furnace tuyere opening and the middle sleeve